City Of Fort Morgan – Community Rec Center Fort Morgan, CO
Big Johnson Construction ( www.bjcsteel.com) started erecting this 40,000 SF B&C Steel pre-engineered metal building on September 1. In less than three weeks, it was ‘topped-out’. This community recreation center is engineered around four ‘cluster’ buildings,...
Kennon Manufacturing Sheridan, Wy
Steel is in the air at the Kennon Manufacturing (www.kennonproducts.com) campus in Sheridan, WY. As a producer of quality sun shields for the aviation industry, Kennon has extended its roots in the Wyoming community by investing in a new, 30,000 SF, state-of-the-art...
Converse County Road & Bridge (Maintenance Facility) Douglas, WY
Caspar Building Systems (www.casparbuildingsystems.com) selected B&C Steel as the manufacturer for the new Converse County Road & Bridge maintenance facility in Douglas, WY. The project has 25,000 SF of service bays, which includes dual runways for a 10-ton...
Polar Service Centers Casper, WY
Polar Service Centers is the nation’s largest network of commercial parts and repair facilities dedicated to the tank trailer and tank truck industry (www.polarservicecenters.com). When PSC looked to expand into the Rocky Mountain region, they chose Can Do...
YMCA – Scottsbluff, NE
Kindvall Siding and Construction of Scottsbluff can be seen here installing a standing seam insulated metal panel. The existing roof is about 22,000 square feet. We used an insulated metal panel as they’re known for their superior thermal properties. Half of this roof...
Johnson Moving & Storage
Construction has started on the 38,000 SF pre-engineered metal building for Johnson Moving & Storage in Fort Collins, CO. This building is 175’ x 218’ with a 36’ eave height. It was designed to be a climate-controlled ‘POD’-storage facility. An additional 2,400 SF...
H&M Properties – Wellington, CO
Now Open – This 12,000 SF metal building was developed by H&M Properties and HMS Contractor, Inc (www.hmscontractors.com). It includes an additional 3,000 SF of mezzanine space, and was subdivided into four ‘flex-space’ bays, which includes operations by Sparge...
Phillips County Fairgrounds Pavilion
B&C partnered with Maverick Steel Erectors (www.mavericksteel.net) on this project for the Phillips County Fairgrounds. It boasts nearly 88,000 square feet of flex-space for livestock shows, agriculture exhibits, farm and ranch trade shows, rodeo competition, and...
New Machinery In Action!
B&C Steel now has the ability to produce multiple roof and wall metal panels for commercial and residential applications. These include standing seam roof panels, snap lock roof panels, and flush wall/soffit panels. If you've ever wondered how there are made, have...
Weatherby Project
Update - June 6, 2019 – Sheridan, WY. Dick Anderson Construction has completed the 63,000 SF corporate headquarters and manufacturing facility for Weatherby.
Target Rental – Durango, CO
February 2019 - General Contractor: Buena Vista Builders This project is a 6,826 sqft Sales & Service Center for Target Rental, a Bobcat and equipment rental company. Project highlights are the use of both vertical & horizontal wall panels, stepped parapets...
Habitat ReStore – Durango, CO
February 2019 – General Contractor: JITA Contracting This project is an approximately 8,530 sqft office, showroom & warehouse facility that includes another roughly 2,286 Sqft of parking and storage canopies. Some of the highlights include both vertical and...
Polo Properties – Castle Rock, CO
November 16, 2018 – Castle Rock, CO: Polo Properties is developing nearly 13,000 SF of mixed-use office/warehouse space and is utilizing the benefits of B&C’s pre-engineered metal building system. This project is being erected by Maverick Steel and will have a...
Casco Construction – Colorado Springs, CO
November 16, 2018 – Colorado Springs, CO: Construction has begun on Casco Construction Corp’s 17,000 SF light-industrial/flex-space in Colorado Springs, which includes another 8,000 SF of steel/bar joist mezzanine. The exterior will be a balance of B&C’s PBR...
Power Equipment Facility
September 27, 2018, Greeley, CO – B&C Steel was selected by DSP Builders to complete the engineering and fabrication at the new Power Equipment facility in Greeley. The collaboration with VFLA Architects (Fort Collins, CO) produced a new 26,000 SF pre-engineered...
Weatherby Project
July 26, 2018 - Sheridan, WY. Dick Anderson Construction is making progress at the 63,000 SF corporate headquarters and manufacturing facility for Weatherby.
B.E.A.S.T. (Recreational Center)
Cheyenne, WY. - Redco Construction nears completion of 22,000 SF of PEMB for B.E.A.S.T. (recreational center). B&C Steel is excited to be part of this project that will include six basketball courts and four volleyball courts. Final completion expected in Fall...
Monument Waste Services
TPI industrial erecting Monument Waste Services facility in Grand Junction, CO.
Minute Man Missile Site
Kindvall Siding & Construction, Inc a local contractor out of Scottsbluff, NE installing precast for Wall, SD Minuteman Missile National Historic Site. The project consists of 280,000 pounds of precast panels and a structural steel...
Platte Valley Bank in Casper, WY
Casper, WY. NOW OPEN. Caspar Builders has completed the 12,000 SF commercial building for Platte Valley Bank. B&C Steel was selected to fabricate the structural steel members, including columns, beams, decking, handrails, bollards, lintels, and trash gates.